Regional Plan Association fully supports the implementation of congestion pricing to help reduce congestion, reduce harmful emissions and to generate revenue to support improvements in public transportation. While much of the attention of the program has been placed on the localized impact of the congestion zone, it is important to highlight systemwide improvements that have recently been made to MTA’s infrastructure. These enhancements are not only critical to supporting the effectiveness of the congestion pricing program, but to the overall vitality of the system, regional mobility and negating adverse impacts from climate change. Congestion pricing will be instrumental in providing sustainable funding for the MTA projects listed below.
Systemwide improvements
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at more than 200 stations
Local Improvements are listed below
![Congestion Pricing Graphics map and icon1](https://img.imageboss.me/general/width/300/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=da8bf761e51826ff56af9f2791f540ccee13a9b2f5214def90808c5f923916c8 171w, https://img.imageboss.me/general/width/600/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=8ee7915e1386bfeb4398e7f22eff38750ba27d00e2efecb1f653018b2f0a5dba 343w, https://img.imageboss.me/general/width/900/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=be8c1861d7e7fa80a3689e1a9e0af595d3f273b36bfeca3cd7c14f3f12cb7a92 514w, https://img.imageboss.me/general/width/1200/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=32800f71a3f813f519859aa02ef44b86aaee57fe43a8858a6a4d79dc3d0865da 686w, https://img.imageboss.me/general/width/1500/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=7957f7a25d799d67015b13d088f6525e09215ebe46b0a7237d0d4d88ad0ca6ba 857w, https://img.imageboss.me/general/width/1800/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=3bc38800779531dd6f076b500527f9060ff687578c9b92ea31add20d6cb45872 1029w, https://img.imageboss.me/general/width/2100/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=c39b53eed9958c426ac88eb91130b88651a66435a5bdd95fc6207102fccf067d 1200w, https://img.imageboss.me/general/width/2400/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=18c6c11911a5d7db873fe10fb01a7cdbf441758cb1753a8e2a8f7fd5e6b6ccfd 1371w, https://img.imageboss.me/general/width/2700/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon1.png?bossToken=4f8127666cbfbbea7ae3981e6f6e13ddfb26d91624029f3185273f2ab1f25733 1543w)
Northeast Bronx
These MTA projects are underway or already completed:
- ADA accessibility at Gun Hill Rd (5) station, with work underway at Westchester Sq-East Tremont Av
- Work underway for Penn Station Access, bringing Metro-North service into Penn Station with new stations at Hunts Point, Parkchester/Van Nest, Morris Park and Co-op City
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Wakefield-241 St (2) station, Parkchester (6) station and more throughout the system.
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
- Retrofitting of Gun Hill and Eastchester Bus Depots to service new electric bus fleet
Northwest Bronx
These MTA projects are underway or already completed:
- ADA accessibility at Bedford Park Blvd (B/D) and 170 St (4) stations, with work underway at Moshulu Pkwy (4) and Tremont Av (B/D) stations
- Work underway for Penn Station Access, bringing Metro North service into Penn Station with new stations at Hunts Point, Parkchester/Van Nest, Morris Park and Co-op City
- Comprehensive structural repairs on the Concourse line currently underway
- Accessibility upgrades at Moshulu Pkwy (4), Burnside Av (4)
Planned but at-risk without congestion pricing:
- Accessibility upgrades at Van Cortlandt Park 242 St (1), Burnside Av (4), and Kingsbridge Rd (4) stations, and stations throughout the system
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
- $2.5 billion earmarked for upgrades at multiple stations
- Retrofitting of Kingsbridge Bus Depot to service new electric bus fleet
Southeast Bronx
These MTA projects are underway or already completed:
- Work underway for Penn Station Access, bringing Metro-North service into Penn Station with new stations at Hunts Point, Parkchester/Van Nest, Morris Park and Co-op City
- Accessibility upgrades at 149 St, 149 St-Grand Concourse, Tremont Av, Westchester Sq-East Tremont, 167 St (B/D), Brook Av (6) stations.
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Brook Av (6), 3 Av-138 St (6) and 167 (B/D) stations, and more throughout the system
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
Southwest Bronx
These MTA projects are underway or already completed:
- Reduce flooding at the 138 St-Grand Concourse station (4/5)
- ADA accessibility at the 170 St (4) station, with work underway at 149 St / Grand Concourse (2/4/5) and E 149 St (6) stations
- Work underway for Penn Station Access, bringing Metro North service into Penn Station with new stations at Hunts Point, Parkchester/Van Nest, Morris Park and Co-op City
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Brook Av (6), 3 Av-138 St (6) and 167 (B/D) stations, and more throughout the system
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
![Congestion Pricing Graphics map and icon7](https://img.imageboss.me/general/width/300/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=5b392a406eabcb4fcea844ad462d76e72da7b2018ef2406f85fc22c97a594a05 171w, https://img.imageboss.me/general/width/600/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=24036fb32521052124f05ad8c0156e71e14315cba1b8675875bddc134eb61944 343w, https://img.imageboss.me/general/width/900/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=88b1401909350adf0a5674b66d1999918f31ba5348bf430fb5c5d3b9438211b5 514w, https://img.imageboss.me/general/width/1200/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=30cd99d6d7794c7e74134e2c71bcc9aa746577e60872620cdd06b0a300df2eb5 686w, https://img.imageboss.me/general/width/1500/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=3389025540a9cc08f91ef2ce7a18d5a21a5b5feed2d78ca2f1c913f72f70c25c 857w, https://img.imageboss.me/general/width/1800/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=ed8cc08e00790eadcaea54f38afa88f52547a941641fa8b2a4380295e5a6cf29 1029w, https://img.imageboss.me/general/width/2100/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=1093b9cf16bec61f95661a2fc4babf2bbfce1f24d46291fbd6aa2cc98039d917 1200w, https://img.imageboss.me/general/width/2400/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=f3e0fe30dbe91b8a1af59b2dafdf6b47579f4a4f926b7a1df32af3f43b976ab6 1371w, https://img.imageboss.me/general/width/2700/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon7.png?bossToken=aef77400792324bdb9d68a4fbe1f904534ed14ba5bb6829d5341db81cd1eb170 1543w)
Central Brooklyn
These MTA projects are underway or already completed:
- Replacement of the 100+ year old viaduct that connects the M line with the J/Z line for better service
- ADA accessibility at the Eastern Parkway – Brooklyn Museum (2/3) station, with work underway at the Church Av (B/Q) station
- New elevators and full ADA accessibility at the Nostrand Av LIRR Station, completed in February 2020
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Classon Av (G), Myrtle Av (J/M/Z), and Nostrand Av (A/C) stations, and more throughout the system
- More reliable train service on the A/C/G lines with signal modernization to replace 80+ year old equipment on the Fulton and Crosstown lines
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
East Brooklyn
These MTA projects are underway or already completed:
- ADA accessibility at Livonia Av (L) and Canarsie-Rockaway Pkwy (L) stations, with work underway at Junius St 3 station
- More reliable train service on the L line after the closure in 2019
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Broadway Junction (A/C/J/Z/L), New Lots Av (3), Norwood Av (J/Z) stations, and more throughout the system
- Replace the roof and upgrade compressed natural gas equipment at Spring Creek Depot
- More reliable train service on the A/C lines with signal modernization to replace 80+ year old equipment on the Fulton line
- $3 billion earmarked for track and switch replacement systemwide
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
- Retrofitting of East New York Bus Depot to service new electric bus fleet
North Brooklyn
These MTA projects are underway or already completed:
- Full ADA accessibility at Greenpoint Av (G) and Bedford Av (L) stations, with work underway at Lorimer St (L) / Metropolitan Av (G) and Grand St (L) stations
- More room for passengers and better pedestrian flow at Marcy Av (J/M) station
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Myrtle Av (J/M/Z) and Jefferson St (L) stations and more throughout the system
- More reliable train service on the G line, with signal modernization to replace 80+ year old equipment on the Crosstown line
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
- Retrofitting of Grand Av Bus Depot to service new electric bus fleet
South Brooklyn
These MTA projects are underway or already completed:
- Full ADA accessibility at the 86 St ® and Av H (Q) stations, with work underway at 95 St ®
- More reliable train service on the F line, with the Culver line signal modernization project in construction
- Improved signage, lighting and more space for riders at the Bay Ridge Av ® station
- Resiliency upgrades to the Coney Island Yard
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including 18 Av (D), Sheepshead Bay (B/Q), Kings Hwy (N), Av I (F), Kings Hwy (F), and Neptune Av (F) stations and more throughout the system
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
- Retrofitting of Ulmer Park and Jackie Gleason Bus Depots to service new electric bus fleet
Western Brooklyn
These MTA projects are underway or already completed:
- ADA accessibility at 59 St (N/R) station, with work underway at 7 Av (F/G), and 8 Av (N) stations
- Elevator replacement at Clark St (2/3), with Court St (2/3) now underway
- Improved station efficiency and escalator replacement at Jay St (A/C/F) station
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including 36 St (D/N/R), Hoyt-Schermerhorn Sts (A/C/G), and Borough Hall (4/5) stations and more throughout the system
- More reliable train service on the A/C/G lines with signal modernization to replace 80+ year old equipment on the Fulton and Crosstown lines
- Construct pump room at Rockwell Place/4 Av
- Rehab pump room at Adams St
- Water remediation at Atlantic Av-Barclays Center (2/3/4/5/B/D/N/Q/R)
- Station upgrades at Chambers St (J/Z)
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
![Congestion Pricing Graphics map and icon2](https://img.imageboss.me/general/width/300/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=5b9708dd585675217f51f5a334823da03d06720be9a453d03213e530d808e565 171w, https://img.imageboss.me/general/width/600/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=1221cf9d6c526fdc7714eb8dfbd174d24e9bf8417637550f892f12acfa1a03a2 343w, https://img.imageboss.me/general/width/900/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=3015f1a77d42372f837dd7366b78e043ddd752d2a159b7de38cb23414e59fae4 514w, https://img.imageboss.me/general/width/1200/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=0f29bd732f3eddf36d1614c69fab97aa396affe73c7f8cfef43dde80a91c970d 686w, https://img.imageboss.me/general/width/1500/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=2dd2962df2413d56463cdc53176a13a0dbe281add35af4662c68edc3519a0cb8 857w, https://img.imageboss.me/general/width/1800/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=7dd1ecd2e0116f9c70a796e33dd2886af5079bf37ea98695f5eab7e61f3be99a 1029w, https://img.imageboss.me/general/width/2100/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=c349c335621dbe138590ff6c5711fb7d0e7c02c038d4071c9766b4061e62e7fe 1200w, https://img.imageboss.me/general/width/2400/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=5403d840e021be3f34196eff337f745fb14ddc0ce2415c2ebae240b9f94a892e 1371w, https://img.imageboss.me/general/width/2700/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon2.png?bossToken=feab27a13ed65a4857994baff16b6e113e0930dfdbbd1f363b10a7bc07e8917d 1543w)
Downtown Manhattan
These MTA projects are underway or already completed:
- Repair stairs at Franklin St (1), 14 St (B/D/F/1/2/3/4/5/6) and Canal St (N/Q) stations
- ADA accessibility at 1 Av (L) and Chambers St JZ stations, with work underway at 14 St 123, 14 St (F/M), and 6 Av (L) stations
- More reliable train service on the A/C/E with 8 Av line signal modernization underway
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Essex St (J/M/Z) and Delancey St (F), and more throughout the system
- More reliable train service on the F, with 6 Av line signal modernization
- Chambers St (1/2/3) station upgrades
- Escalator replacement at Bowling Green Station (4/5)
- Construction of a new substation for increased and better subway service on the 8 Av Line
- A new substation for better service on the (A/C/E)
- Station upgrades at Chambers St (J/Z)
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
Midtown Manhattan
These MTA projects are underway or already completed:
- More and better service on the A/C/E, with 8 Av line signal modernization underway
- A newly reconstructed Times Sq-Grand Central shuttle
- ADA accessibility at 1 Av (L), Times Square 42-St (S), and 57 St-7 Av (N/Q/R/W) stations, with work underway at 14 St (1/2/3), 14 St (F/M), and 6 Av (L) stations
- Elevator replacement or updates at 34 St-Herald Sq (B/D/F/M/N/Q/R/W); 34 St-Penn Station (1/2/3); Grand Central 42-St (4/5/6)
- Modernization of 34 St - Penn Station on the 1/2/3/A/C/E lines, with work on new 7 Av entrance completed in 2020, concourse project leading to 8 Av underway
- Improved passenger circulation at Grand Central-42 St (4/5/6/7) station – eight escalators being replaced, stairs being widened
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Lexington Av-59 St (N/Q/R/W), 59 St (4/5/6), 42 St-Bryant Park (B/D/F/M) / 5 Av (7) stations, 7 Av (B/D/E), and more throughout the system
- More reliable train service on the F, with 6 Av line signal modernization
- A new substation for better service on the (A/C/E)
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
Northern Manhattan
These MTA projects are underway or already completed:
- Modernization of Metro-North 125 St Station
- ADA accessibility work underway at 181 St (A) and Dyckman St (1) stations
- Elevator replacement at Inwood-207 St, 181 St and other stations
- Escalator replacement at the 181st St (A) station
- Resiliency upgrades to the 207 St Yard and 148 St Yard
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Harlem 148 St (3), 110 St (6), 168 St (1), 137 St (1) stations and more throughout the system
- Water remediation at 190 St (A)
- Station upgrades at 190 St (A)
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
- Retrofitting of Clara Hall Bus Depot to service new electric bus fleet
Upper East Side
These MTA projects are underway or already completed:
- ADA accessibility work underway 68 St-Hunter College (6) station
- Elevator replacement underway at Roosevelt Island (F)
Planned but at-risk without congestion pricing:
- Extend the Second Av Subway from 96 St to 125 St
- ADA accessibility at more stations, including 86 St (4/5/6), 110 St (6), and 59 St (4/5/6)
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
Upper West Side
These MTA projects are underway or already completed:
- Enhancements to improve the station environment and customer experience at 72 St (B/C) and 86 St (B/C) stations
- Stair repairs at 79 St (1) station
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including 81 St-Museum of Natural History (B/C) and 96 St (B/C) stations and more throughout the system
- West End structural overcoating and repairs
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
![Congestion Pricing Graphics map and icon6](https://img.imageboss.me/general/width/300/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=79a21d561e83350b6c4661f3b61b7e06c597ab6ed1bfba7dfb2f0f0e6f69545f 171w, https://img.imageboss.me/general/width/600/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=e1e8fe34cb35454394bf199b2d66b5edea324d79c98aa51b0957d7c7e2b1794b 343w, https://img.imageboss.me/general/width/900/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=c015e1c6c893a18f1773fc8413af162a903c7cb557141c38e1f2cba2fe6c39c1 514w, https://img.imageboss.me/general/width/1200/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=91c31a94ccd586680613a1a6cdb30e581605c75d6457f8ca61815bc1cc41acb9 686w, https://img.imageboss.me/general/width/1500/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=6badaf8b61725016c7d977469af31bec994884d8003b9a2615ba5dadcccc35f5 857w, https://img.imageboss.me/general/width/1800/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=4a43b6254f14dbd32539db206d4eb34bf6dfef0658b64ee2e54fcf58e9d28d8d 1029w, https://img.imageboss.me/general/width/2100/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=01b487a3f057d43321bcbdd89c9a0596f879615144f00e5cb0726df4f432d845 1200w, https://img.imageboss.me/general/width/2400/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=db7d593c80b0ce92fd8333e139b6c4800494946d249b1b137961f5c90b438b03 1371w, https://img.imageboss.me/general/width/2700/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon6.png?bossToken=e12ead4e2c02928bd0e8f45e81a4d507ff31dd77c0e797f5e2b6af8c256bd737 1543w)
Northeast Queens
These MTA projects are underway or already completed:
- 40% increase in LIRR service once Grand Central Madison and LIRR Third Track projects are completed later this year
- A new terminal with direct access to the East Side of Manhattan in Grand Central Madison, opening by the end of the year
- More reliable service on the (E/F/M/R) through the Queens Boulevard East and West signal modernization projects
- Circulation improvements to reduce crowding at Flushing-Main St (7) station
- New elevators to make Murray Hill station wheelchair accessible
Planned but at-risk without congestion pricing:
- ADA accessibility and state of good repair at Mets-Willets Point LIRR station
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
- Retrofitting of Queens Village and Jamaica Bus Depots to service new electric bus fleet
Northwest Queens
These MTA projects are underway or already completed:
- More reliable service on the E/F/M/R through the Queens Boulevard signal modernization projects
- Accessibility upgrades at Astoria Blvd (N/W) and Court Sq-23 St (E/M) stations, with work underway at Queensboro Plaza (7/N/W) and Court Square (G) stations
Planned but at-risk without congestion pricing:
- More reliable train service on the G line, with signal modernization to replace 80+ year old equipment on the Crosstown line
- Accessibility upgrades at more stations, including Northern Blvd (M/R), 33 St-Rawson St (7), 46 St-Bliss St (7), Broadway (N/W), Steinway St (N/R) stations and more throughout the system
- Resiliency improvement at Corona Yard
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
Southeast Queens
These MTA projects are underway or already completed:
- More reliable service on the E/F/M/R through the Queens Boulevard signal modernization projects
- 40% increase in LIRR service once Grand Central Madison and LIRR Third Track projects are completed later this year
- ADA accessibility work underway at Beach 67 St (A) and Woodhaven Blvd (J) stations
- Elevator replacement at Sutphin Blvd (E/J/Z)
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Parsons Blvd (F), Briarwood (E/F), and Rockaway Blvd (A) stations and more throughout the system
- Replacement of the Jamaica Bus Depot, including new electric bus charging infrastructure
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
Southwest Queens
These MTA projects are underway or already completed:
- ADA accessibility work underway at Woodhaven Boulevard (J/Z) station, along with other station upgrades
- More reliable service on the E/F/M/R through the Queens Boulevard signal modernization projects
- Track replacement on the J/Z line
Planned but at-risk without congestion pricing:
- ADA accessibility more stations, including the Briarwood (E/F) station and the Forest Hills LIRR station, along with others throughout the system
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple stations
![Congestion Pricing Graphics map and icon8](https://img.imageboss.me/general/width/300/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=ec0b8e6d89fe4abeb66a7e66426a2ca214edf80eeb7d4bc0757bbc4017b9b02a 171w, https://img.imageboss.me/general/width/600/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=82380081d26c701a470fb571507ae26a574bbbb0b8aca5bcb823899cb3e81caf 343w, https://img.imageboss.me/general/width/900/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=c40c28ff6d7123fba326b1356e1403e3168b683bf85d5629757ba2f9d46c1e9e 514w, https://img.imageboss.me/general/width/1200/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=337b5cb235efeca8758b35397fc9f1a78d47298d38f6d362914addeb0fbebd5d 686w, https://img.imageboss.me/general/width/1500/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=975547ec5cf2f9e3afc0ae4cd016c771c7fa36cdc68d1e7e3b34d65d4c37fd87 857w, https://img.imageboss.me/general/width/1800/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=4775a27c2f2b8e8d75227018ba60bcafb0c3d587aee28eb9f54a46a6785be3d0 1029w, https://img.imageboss.me/general/width/2100/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=23d82bb5b3443e2077c66d1b1bde1a9ca27b6f96ec46f7bb8844612a6fb6dc2b 1200w, https://img.imageboss.me/general/width/2400/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=87fec69b39fc0846e2216f7dfe240087718647e7bbea8b13f70f8d7b91a78ea7 1371w, https://img.imageboss.me/general/width/2700/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon8.png?bossToken=85a100b01eab0ac721284759e76f3697d912edd97fbe95ce2051417a4387bcf2 1543w)
These MTA projects are underway or already completed:
- ADA-accessibility upgrades currently in construction at New Dorp
- New substations at Clifton, New Dorp and Tottenville for better rail service
- Fix the 80-year old Amboy Road Bridge
- Relocation of Staten Island Railway maintenance shop and headquarters to a new state of the art, storm-resilient Clifton Shop
Planned but at-risk without congestion pricing:
- ADA accessibility at more stations, including Clifton and Huguenot stations and more throughout the system.
- More express and local bus service, and transition to a zero-emissions bus fleet – transitioning to a complete zero-emissions fleet by 2040
- More than 1,500 busses scheduled for purchase, include nearly 500 electric and more than 100 express busses
- Improve reliability and reduce delays on the SI Railway by fixing tracks and signals at the Tottenville interlocking
- Protection against flash floods and other extreme weather events
- Security upgrades, including new cameras, at multiple station
- Retrofitting of Yukon Bus Depot to service new electric bus fleet
![Congestion Pricing Graphics map and icon3](https://img.imageboss.me/general/width/300/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=99fa9bf6c42768b585d665a471aa44406d2697769b9b8817ba23f49cf14f74c5 171w, https://img.imageboss.me/general/width/600/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=a48a9ed9b3e8f0f98960cb75f846fe65cf028940179038a1dada411410429d78 343w, https://img.imageboss.me/general/width/900/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=0691a84a35ce673cbdadc3f7d9bb633d3dc1595199caee3ddc559b6ebeddb618 514w, https://img.imageboss.me/general/width/1200/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=2bbafb3af57c942c1580f108ad5823cd506bba96c97ea3c2f91177cada998e80 686w, https://img.imageboss.me/general/width/1500/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=f6f63504fc65351b05faba26b16c99737efa4b5bfae637c26aa5dbc8c4fd3c05 857w, https://img.imageboss.me/general/width/1800/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=e7b82b2d5beacfd3ef8c5cf4c757c4f915b8cb2cc5504428108d0e69e5f33c44 1029w, https://img.imageboss.me/general/width/2100/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=c00dc740d1009a54eb228a748652c1793095ba8e8b484df79137fb1f1c167667 1200w, https://img.imageboss.me/general/width/2400/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=c16592f5501bb93a93b6a323d8db95b3eeeb78b825e7c8348af43669e3c8b5ca 1371w, https://img.imageboss.me/general/width/2700/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon3.png?bossToken=2fdc7aa6890ba95bc995e1ec86738b3f9ea1b665e264f2bae87e542aba87958d 1543w)
These MTA projects are underway or already completed:
- 40% increase in service once Grand Central Madison and LIRR Third Track projects are completed later this year
- A new terminal with direct access to the East Side of Manhattan in Grand Central Madison, opening by the end of the year
- Platform replacements and technology upgrades at many stations, including station rebuilds as part of LIRR Third Track project and the new Elmont station scheduled for full completion in October 2022
- A new electric train storage yard on the Main Line in central Suffolk County, completed in November 2020
Planned but at-risk without congestion pricing:
- Improve signaling for improved service at Babylon Station – Babylon interlocking renewal and signal improvements east to Patchogue included in current capital plan
- Improve signaling for improved service at Babylon Station – Babylon interlocking renewal and signal improvements east to Patchogue included in current capital plan
- More ADA accessibility throughout the LIRR system, including Amityville, Laurelton, Lindenhurst, Massapequa Park, Forest Hills, Hollis, Douglaston, and Cold Spring Harbor
- Reconstruction of Penn Station, taking advantage of a once-in-a-generation opportunity between the opening of Grand Central Madison and Penn Station Access
- Further capacity improvements at Jamaica to address the “Jamaica crawl”
![Congestion Pricing Graphics map and icon4](https://img.imageboss.me/general/width/300/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=c9f3a05cb5d362cdd9d2bf04bc23573caf5aecc0e67ca985c04d4aa0467e5ce2 171w, https://img.imageboss.me/general/width/600/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=21df3cb96c382ad4128e24618d1b793dea5e2d540d9171448efd5a8c2115a748 343w, https://img.imageboss.me/general/width/900/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=a02d231fd8f373032d1a147e39b5b8801755fb821f63abff1d315d41ab70524d 514w, https://img.imageboss.me/general/width/1200/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=e07878943a353282b55d9baf16efaaacdf612f79f5dadea9387eed8b82ecfcb7 686w, https://img.imageboss.me/general/width/1500/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=54cc70cd3a9580ddd01a3a36aa708d8e0b593a082fda71d9084d761014aa1fc5 857w, https://img.imageboss.me/general/width/1800/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=6f43436537244df332902d1afb07ffb7cdb3721eaa8959a17f844c57c740a80d 1029w, https://img.imageboss.me/general/width/2100/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=4cd437e904bcc27683ba6c604ede478bf8b7dd1c2cd2e2b6085c4ba9881fc6a7 1200w, https://img.imageboss.me/general/width/2400/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=72f146b2ef9438e95ddef64bdc7bfb4320ba695ccd8abfd83c050f73417c37ea 1371w, https://img.imageboss.me/general/width/2700/quality:80/latest/Congestion-Pricing-Graphics-map-and-icon4.png?bossToken=63c9d1a1478aec01c77ef1466cbbca8a8c9f5297818d2c67cf44126eb33f5ed8 1543w)
These MTA projects are underway or already completed:
- Completion of the Station Improvement Initiative, including major renovations at White Plains, Harlem-125 St, Crestwood, Port Chester and Riverdale stations.
- Signal modernization on the Port Jervis Line
- Work underway on the Penn Station Access project to take the New Haven line directly into Penn Station, add four new stations in the Bronx, and create more capacity in Grand Central Terminal
- Work underway to enhance Scarsdale, Hartsdale, and Purdy’s stations and deliver full ADA accessibility
Planned but at-risk without congestion pricing:
- Replacement of the 125-year-old Park Av Viaduct, repair the Park Av Tunnel, and reconstruct the Grand Central Trainshed
- Replacement of the locomotive fleet to improve service reliability
- Delivery of new M9 rail cars
- Replacement of deteriorated platforms to improve pedestrian safety and provide new heated platforms
- Repair of Grand Central’s track and platform areas
- Improved service on the Port Jervis line
- More ADA accessibility throughout the Metro-North system
- Croton Harmon to Poughkeepsie signal upgrade