TITLE 4

Jul 2026

Destination Meadowlands 2050

A Design Vision for a More Connected, Resilient Sports and Entertainment Complex

Destination Meadowlands 2050 reimagines the Meadowlands Sports Complex as an interconnected site that brings entertainment, recreation, and ecological preservation into a single destination with a clear sense of place.
Vision0 Eco Center Aerial
Render triptych
Vision1 Site Plan Labeled
1

The Meadowlands: Historical Context

Metropolitan Scale1 Context

The Meadowlands District is a 30-square-mile geography situated a few miles from New York City.

2

The Meadowlands: Existing Conditions

Metropolitan Scale2 Transportation Metropolitan Scale3 Stadium Venues Metropolitan Scale4 SLR 4 Static

Land Use within the District 2018

Category Land Use 2018 Acres 2018 Percent

Natural Area

Wetlands

6,213.2

32.0%

Water

1,397.5

7.2%

Recreational Land

190.1

1.0%

Transportation

3,974.4

20.5%

Industrial

3,149.9

16.2%

Utilities

580.3

3.0%

Meadowlands Sports Complex

580.0

3.0%

Residential

400.6

2.1%

Developed Areas

Public/Quasi-Public Services

335.2

1.7%

Commercial Retail

286.6

1.5%

Commercial Office

164.2

0.8%

Industrial & Commercial Complex

163.0

0.8%

Hotels and Motels

86.9

0.4%

Other Areas

Altered Land

1,067.6

5.5%

Transitional Land

748.7

3.9%

Vacant Land

57.7

0.3%

Total Acres

19,396.0

100%

Source: New Jersey Sports and Exposition Authority (NJSEA) 2020 District Master Plan

District Scale0 Jurisdictional District Scale1 Land Use District Scale2 Roads District Scale3 Rail District Scale4 SLR 4 District Scale5 Sandy Inundation District Scale6 Parksand Trails

Images from Dekorte Park and the Secaucus Greenway near Mill Creek Point Park offer stunning wetlands views.

Images taken October and November of 2025.

Photos1 Wetlands Lovely Photos2 Wetlands Lovely Photos3 Wetlands Lovely Photos4 Wetlands Lovely
3

The Meadowlands: Future Goals

Metropolitan Scale4 SLR Gif

Animation illustrating a projected 4-foot sea level rise within the metropolitan area, highlighting the Meadowlands district as a major zone of inundation.

New Jersey Sea Level Rise estimates above the 1995-2014 baseline (ft)

Across Emissions Scenarios Low Emissions (SSP1-2.6) Intermediate Emissions (SSP2-4.5) High Emissions (SSP3-7.0)

Degrees of Warming (°C)

1.7 (1.3-2.5)°C Warming

1.9 (1.3-3.1)°C Warming

1.6 (1.2-2.3)°C Warming

2.6 (2.0-3.6)°C Warming

3.8 (3.0-5.0)°C Warming

Year

2040

2050

2100

2100

2100

Extremely Likely to be Exceeded *

95% Chance SLR Exceeds

0.5

0.7

1.3

1.8

2.1

Likely Range **

83% Chance SLR Exceeds

0.7

0.9

1.8

2.2

2.6

~50% Chance SLR Exceeds

1.0

1.3

2.4

2.9

3.3

<17% Chance SLR Exceeds

1.3

1.7

3.3

3.8

4.3

Extended Likely Range

<17% Chance SLR Exceeds

1.4

1.9

3.7

4.5

5.2

Extremely Unlikely to be Exceeded ‡‡

< 5% Chance SLR Exceeds

1.7

2.3

5.1

6.2

7.5

*Including or Excluding Potential Rapid Ice-Sheet Loss Processes **Excluding Potential Rapid Ice-Sheet Loss Processes ‡Including Potential Rapid Ice-Sheet Loss Processes ‡‡Including Potential Rapid Ice-Sheet Loss Processes Source: NJ’s Rising Seas and Changing Coastal Storms, Rutgers University New Jersey Climate Change Resource Center

History3 Meadowlands National Park1 Before
History2 Meadowlands National Park2 After

Meadowlands National Park idea from RPA’s Fourth Regional Plan, 2017. Illustrated by ORG.

4

Meadowlands Sports Complex: A Strategic Opportunity

Site Scale1 Labeled Context Site Scale2 Land Use Site Scale3 Roads Site Scale4 Transit Site Scale5 SLR Site Scale6 Impervious
History4 Site Historical Imagery Timeline

Historical satellite imagery of the Meadowlands Sports Complex from 1931 -2023.

Major Investments Related to the Meadowlands Sports Complex Since 2010

Site Investment Project Year Amount

Existing

MetLife Stadium

Stadium Construction

2010

$1.6B

Meadowlands Racetrack

Grandstand Construction

2013

$88M

American Dream Mall

Mall Construction

2020

$5B

2026 World Cup Upgrades

Stadium Upgrades

2023

$16M

Additional Pedestrian Bridge across Route 120

2022

$30M

Transitway Bus Route

2026

$100M

Total



$6.83B

Future

Convention Center

Proposal Estimated Cost of Construction

$3B

Source: MetLife Stadium, The Real Deal, The New York Times, NorthJersey.com, NJBiz, and The Meadowlands Chamber of Commerce.

Accessible areas around the Meadowlands Sports Complex consist of large roadways that make it dangerous, unwelcoming, & hard to navigate, even for drivers.

Photos Ped Bridge1 Photos Ped Bridge2 Photos5 Sports Complex Roads Photos6 Sports Complex Roads Photos7 Sports Complex Roads Photos8 Sports Complex Roads

Just outside of the Complex, natural wetlands and the Hackensack River are neither visible nor physically accessible to most visitors.

Screenshot 2026 06 11 at 6 45 49 PM Screenshot 2026 06 11 at 6 46 03 PM Screenshot 2026 06 11 at 6 44 11 PM Screenshot 2026 06 11 at 6 47 34 PM
5

Destination Meadowlands 2050: RPA Vision

Vision2 Framework Goals

Large-scale framework goals focus on nature, access, and development.

These design strategies build upon many of the District-wide “Systems Plan Objectives” outlined within the 2020 NJSEA Master Plan:

Vision1 Site Plan Labeled
Vision Mallto Met Life Existing Existing
Vision Mallto Met Life Proposed Proposed

A dedicated street connects American Dream Mall and MetLife Stadium

Vision4 Eco Center Existing 2 Existing
Vision4 Eco Center Proposed Proposed

Meadowlands Ecology Center, the new greenway, and wetlands weave through new development.

Vision3 Rec Spaces Existing Existing
Vision3 Rec Spaces Proposed Proposed

Former parking lot transformed by wetland restoration and the addition of outdoor recreational opportunities

Vision6 Trolly Park Existing Existing
Vision6 Trolly Park Proposed Proposed

Greenway across the Hackensack from Secaucus’ Trolley Park to the Sports Complex

6

Destination Meadowlands 2050: Phasing

Vision7 Phasing Diagram

General phasing approach to this bold vision.

Conclusion

Appendix

Acknowledgements

Funded By

The JM Kaplan Fund

Search Our Reports

Search the entire site